
Meridian 3
75
5.5 Location of Control icons -
Per Philips Graphic sheet
5.6 Color for resin/paint -
Per Philips make-up sheet
5.7 Fire Enclosure Request
Shielding cover should fulfill international standard.
5.8 Resins
y
RoHS required
y
WEEE required.
y
Resin type/selection refers to Project Book Section 7.2 Plastic material.
5.9 If paint is used
y
RoHS required
y
WEEE require
y
If new painting type needs to implement, refer to UN-D 1235.
5.10 Plastic mold tooling
y
Tooling to be designed to minimize cosmetic defects induced by molding process (sink, blush, weld lines,
gate marks, ejector marks, etc.). Refer to “TYV61-90007”.
y
Painting to cover up cosmetic defects due to molding is strongly discouraged.
y
China RoHS mark requested.
5.11 Plastics flammability
y
All Plastics to be Flame Retardant UL 94-HB or better.
y
Base / Rear to be Flame Retardant UL 94-HB.
y
All major plastic parts (bezel, back cover) need to be molded from same resin.
y
Plastic resin type selection should be referred to “plastic-Philips Pool monitor”.
5.12 Texture/Glossing of housing
y
The texture area and texture no should follow Philips make-up sheet.
y
The exterior surfaces shall have a uniform texture.
y
Philips must approve the mold texturing.
y
Detail document for texture refer to “UN-D249”, “UN-D 600”.
y
>= 80 gloss units
5.13 Gap, step of F/C and R/C
y
Gap between bezel and panel
烉
1.2 (Typ.) mm
y
Gap between F/C and R/C
烉
0.4mm
y
Step of F/C and R/C
烉
-0.3mm
Left
炻
right ,top, Bottom , corner :
0.5mm