!
88 Meridian 3
Fig 3:
Cross talk Pattern
Center at Gray level 0 (Black)
YB
1/2
1/2
1/6
1/3
1/3
1/3
1/3
1/3
REGULATORY COMPLIANCE
Worldwide
Regulatory
ŘŘŠœŦŨŶŭŢŵŰųźįŹŭŴ
EMC Requirements
Supplier DVT EMI test result must be submitted prior to DVT samples delivery, and PVT EMI test result
must be submitted again prior to PVT samples delivery, which also has to meet Philips' immunity testing
specification.
RoHS
Restriction on the use of certain hazardous substances.
Lead, Cadmium, Mercury, Hexavalent Chromium, Polybrominated Bipheny1 (PBB) and
Polybrominated Bipheny1 Ether (PBDE)(flame retardant).
WEEE
Producers (Philips) responsible for retailer take back schemes and recycling.
--System implemented.
--Collection and recycle targets.
Ongoing Regulatory
There's a possibility that other regulatory certificates will be required during the life of the product. It is the
responsibility of the supplier to provide related documentation.