background image

Check List for Installation

(This checklist MUST be signed by the installer before system installation handover)

Person in charge of site construction 

Signature/Date

Project Location

No. Item

Description

Result

Remark

1

Installation
location

If the installation location avoid the shade of
the trees or buildings

   

 yes       

 No

2

Base

If structural strength of base meet loacl pole
requirement

   

 yes       

 No

3

Anchor bolts

If the anchor bolts location dimensions
follow the MI

   

 yes       

 No

4

Products

If all components no damaged

   

 yes       

 No

5

Bolts

If four bols are fixed

   

 yes       

 No

6

Work status

If the work status comply to the request

   

 yes       

 No

7

Luminire

If the luminaire can light on

   

 yes       

 No

8

PV panel

If the PV panel can charge the battery
normally.

   

 yes       

 No

Project Name
Scope of check
Site Consrtuctor

Summary of Contents for 01800502

Page 1: ...Urbanspark Mounting Instructions V1 0 Philips China Investment Co Ltd Address No 1602 1605 No 218 Tianmu W Rd Shanghai Post code 200070 ...

Page 2: ...onsible or liable for either indirect or consequential damage or injury that may have resulted from the misuse of this equipment 2 Use tools with insulated handles to avoid inadvertent shorts 3 Verify circuit polarities before connecting 4 Connect sequence a connect load b connect battery c connect charging source 4 Disconnect sequence a disconnect charging source b disconnect battery c disconnect...

Page 3: ...pole after the concrete base solidification completely Cage M20 Nuts Spring washers Flat washers 235 235 60 M20 nuts advise material SUS Spring washers advise material SUS Flat washers advise material SUS Pole foundation and anchor bolts Avoid Locations in the shade of the trees or buildings if you can not avoid the shade you must ensure the shade below the 2m of the pole If you do want to install...

Page 4: ...tion and other construction work Part list Tools Controller Battery Luminaire Cross screwdriver Spanner Max open size 30mm Multimeter optional Socket screw wrench Philips provided it Steel rope Φ1 5mm length 8m Note Luminaire may be different according to different requirements ...

Page 5: ...ire cable through the pole by steel rope 17N m 4mm torque 1 Open the package 2 Open the service hatch with attached tool in the package 3 Lift the top of the pole out of the package and put it on one edge of the package 5 Tighten screws ...

Page 6: ... crane Warning Be careful not to let luminaire hit the crane arm Solution 2 By crane for 4m and 6m pole For reference only Affix the pole Note Whoever installs the system takes full responsibility for safety For reference only Affix the pole by M20 Nuts spring washers and flat washers ...

Page 7: ...Y connect NTC to the controller 5 THIRDLY connect battery to the controller 6 LASTLY connect PV Panel to the controller 7 Check controller indicator lighting status LED 1 Green on LED 2 Green on or flash LED 3 Red off 8 Lock the service door at the end LED 3 LED 2 LED 1 Notice Must strictly follow the below sequence or it will introduce difficulty on installation ...

Page 8: ...f the trees or buildings yes No 2 Base If structural strength of base meet loacl pole requirement yes No 3 Anchor bolts If the anchor bolts location dimensions follow the MI yes No 4 Products If all components no damaged yes No 5 Bolts If four bols are fixed yes No 6 Work status If the work status comply to the request yes No 7 Luminire If the luminaire can light on yes No 8 PV panel If the PV pan...

Page 9: ...e is other light source irradiate at panel Programe incorrect Re burning the programe Battery volume is low Wait for several sun days for recovering battery or recharge the battery by charger luminaire power is high Re burning the programe Part or all PV panel disconnection Connect all PV panel dimming mode Re burning the programe RTE work mode enable Re burning the programe Power less than spec R...

Page 10: ...finition Under 20 25 six months Under 20 35 three months Under 20 45 one month Warning The recycle of the used battery should strictly follow the local laws and regulations It is forbidden to handle the battery as normal garbage for disposal Do not open short circuit or mutilate batteries as injury may occur Do not put the battery into a pool Never move battery by pulling the cables of the battery...

Page 11: ...ect battery to the controller 8 LASTLY connect PV Panel to the controller 9 Check controller indicator lighting status LED 1 Green on LED 2 Green on or flash LED 3 Red off 10 Lock the service door at the end LED 3 LED 2 LED 1 2 Disconnect all cables and take out the controller 3 take the old battery out and replace a new one 4 Affix controller ...

Reviews: