PAS 280 Operation Guide
5. Recommended Flight Operation Procedure
Page 33 of 46
5
Recommended Flight Operation Procedure
The following procedure is used by Phase One in operational test flights of the cameras. Users should adapt
these procedures for their own needs.
5.1
Before Flight
5.1.1
Before Power On
1.
All cable connections - verify they are correct and secure.
2.
iX Controller CONTROLLER circuit breaker - verify pushed in.
3.
iX Controller CAMERA circuit breaker - verify pushed in.
4.
SOMAG stabilizer POWER SWITCH - verify set to ON.
5.1.2
After Power On
5.1.2.1
POS AV
1.
Verify configuration and lever arm settings using the Applanix GPS GUI.
5.1.2.2
iX Capture
1.
Click the iX Capture icon.
2.
Verify that the application is connected to the camera.
3.
In iX Capture, verify that iX-C-FMS is set to FMS.
4.
Click Settings > System and set LOG
LEVEL to Normal.
Summary of Contents for PAS 280
Page 1: ...PAS 280 Operation Guide Version 1 0 5 Date November 13 2022...
Page 44: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 44 of 46 A 4 POS AV V6...
Page 45: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 45 of 46...
Page 46: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 46 of 46...