background image

4

[INSTALLATION GUIDELINES]

For proper connection and therefore full enjoyment of your new Phase Technology

®

 speakers, 

we encourage you to read this owners’ manual thoroughly, even if you are very familiar with 
installing speakers. Speaker placement is very subjective. Placement follows the guidelines 
for the developers of in-ceiling speakers, yet is also guided by personal preferences. The 
proper spacing, location and adjustment of in-ceiling speakers are critical for complete 
enjoyment of your new speakers. This manual covers these topics thoroughly.

Choose the appropriate mounting location for each speaker.

NOTE:

 When deciding upon a location, consider the following:

• Be certain your speaker wires can be run to or are accessible from these locations.
• Make certain the wall or ceiling material is sturdy enough to support the weight and 
vibration of the speakers.
• Be certain the area behind the speaker is free of obstacles such as wall studs, electrical 
wiring, pipes, etc.
• Each speaker should be positioned properly, relative to the listening area for good coverage.
• Audio performance and room-to-room isolation will be improved if there is some fiberglass 
insulation placed loosely behind the speaker.

[FLANGE INSTALLATION]

STEP 1: 

Using the supplied cutout template, carefully mark the area to be cut out. Using a 

drywall knife or saw, cut a hole in the drywall and prepare the speaker wires for connection 
to the speaker terminals. Remove the grille from the mounting flange by pressing it from 
behind. Insert the mounting flange into the hole.

STEP 2: 

 Remove the grille from the mounting flange by pressing it from behind. Attach  the 

provided white gasket material to the outside, rear edge of the flange.  Insert the mounting 
flange into the hole with the end marked “TOP” facing up. Loosen the flange clamping 
screws one turn (counter clockwise) to release the clamp 

(Fig. 1)

. Use a level to insure that 

the flange is square. Next tighten all 4 flange clamp screws evenly to secure the flange to 
the wall.  It is best to tighten each screw with the same amount of force (torque).  CAUTION: 
Do not over tighten. 

CAUTION: DO NOT OVER-TIGHTEN

.

[SPEAKER INSTALLATION]

STEP 3: 

Use the provided tool to fully open the four Quick Mount

 (QM) clamps. If the tool 

is not available a small screw driver can be used 

(Fig. 2)

.

STEP 4: 

Connect the speaker wires to the spring-loaded input terminals on the rear of the 

speaker, making sure no loose strands are exposed 

(Fig. 3)

.

STEP 5: 

 Insert the baffle into the mounting flange, aligning QM clamps with the four QM 

posts 

(Fig. 4)

. Also make sure that the tweeter is placed at the end of the flange marked 

“TOP”.

STEP 6: 

Tighten down the four QM clamps by pressing them down flush with the baffle’s 

surface 

(Fig. 5)

.

STEP 6: 

Using some familiar source material, listen to the tweeter’s balance with the level 

control in each of its three positions to find your favorite.

STEP 7:

 Carefully install grille by pressing it into the gap between the flange and the baffle 

(Fig. 6)

 and enjoy! 

[FIG. 2]

[FIG. 1]

[FIG. 3]

[FIG. 5]

[FIG. 6]

FLANGE

SCREW

[FIG. 4]

_

Reviews: