2 Caution
2.1, before installation, please check whether the mechanical fasteners for transport
and loose, and do the regular maintenance.
2.2, to maintain voltage stability, otherwise easy to cause the lamp damage.
2.3, please check before the voltage is normal, it is not suitable for frequent switching
power supply, power off,
2.4 You must need to wait for ten minutes to make a light bulb completely cooled
again if need open again..
2,5 in order to ensure the service life of the product, please keep dry and ventilated.
2,6 strictly charged installation and disassembly. The product should do the
maintenance by the the professionals.
2.7 when checked everything is normal, adjust the angle, connect the power supply
and the ground wire..
, do not stare at the lamp light source directly, so as not to damage the eyes.
, please use the electric wire connected more than 2.0 square..
10, please make sure the lamp power is disconnected during the light of installation
and repair.,