Environmental Controllers
•
When setting restrike delays with your environmental controller, it is best to set a restrike delay
at 20 minutes or longer to prevent constant restrikes throughout the day.
•
When installing your controller, it is best to program the controller for a staggered start with 40
luminaires or fewer on each start.
•
It is best to use special HID relays and high inrush circuit breakers to ensure proper performance.
•
Lighting sub-panels should have a fan installed to prevent high heat of the sub-panel and
optimum performance.
2.
Autopilot PX Lighting Controller
The Autopilot PX Lighting Controller is designed to work with the Phantom Commercial DE Electronic
Ballast. Follow the PX Controller instructions for proper operation and to avoid ballast damage. Typical
setup for the PX Controller is shown below.