CAYMAN Part 2 Overview – Operation - Spare parts lists
Packaging
2017-03-22
25
18.5 Transport by car or truck
DANGER!
Danger of injury by unsecured loads!
In case of road transport, all persons involved in
the loading process are responsible for the proper
securing of the load. The responsible driver is
responsible for the operational loading.
18.6 Transport of already running machine
DANGER!
Risk of injury from discharged mortar!
Injuries to face and eyes can occur.
Therefore:
Before opening the couplings ensure that there is
no more pressure on the hoses (observe display
at mortar pressure gauge).
1. Carry out the following steps before beginning the transport:
2. First unplug the mains cable.
3. Unplug all other cable connections and water hoses.
4. Start transport.
5. In case of transport by crane, remove the loose parts.
19 Packaging
For packaging
The individual packages have to be packed in accordance with the
transport conditions to be expected. Only environmentally-friendly
materials were used for the packaging.
The packaging should protect the individual components until the
assembly from transport damage, corrosion and other damage.
Therefore do not destroy the packaging and remove only shortly
before the assembly.
Handling packaging materials
If no agreement for the recovery of the packaging has been made,
separate materials according to type and size and reuse or recycle.
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...