7.4.1 Further course of action for the scraping of pipe ends
Step
Action
4
Installation for the scraping of pipe ends
4.1
Position the rotational peeling tool so that between about 1/2 and 2/3 of the peeler blade,
depending of the pipe dimension and feed setting, rest on the pipe.
7.4.2 Further course of action for the scraping of saddle installation areas
Step
Action
4
Installation for the scraping of saddle areas
4.1
Position the rotational peeling tool on the desired location on the pipe. The blade should be set on
the middle of the outer limit of the marking on the area of contact.