
English
Electric wire rope winch >BETA< SILVERLINE
04.01.401
technische Änderungen vorbehalten
design changes under reserve
changements techniques sous réserve
Seite / page 27
Brake-wear monitoring
For wear monitoring of the brake, regularly check the release path and if necessary adjust it.
If the release path cannot be adjust any more replace the brake disk.
Works on the brake may only be executed by authorised and competent personnel.
release path
S
Lü
gage
Type key
Explanation to drive groups FEM 9.511 for rope drives
The electric wire rope winches are classified according to different drive groups, DIN 15020, FEM 9.511, ISO4301/1 (see tech.
data, page 17)
Those drive groups refer to the rope drive and all mechanical parts of the winch.
It determines the period of time of safe operation depending on load collective.
running Symbol
V006 V012 V025 V05
V1
V2
V3
V4
V5
time
category
medium running time per day in hour, related to one
year
≤
0,12
≤
0,25
≤
0,5
≤
1
≤
2
≤
4
≤
8
≤
16
≥
16
no.
Term Explanation
Drive group
acc. to FEM9.511, DIN15020, ISO4301
load
1
light
exceptionally max. load, continuously very small loads
k < 0,50
1 Em* 1 Em* 1 Dm 1 Cm 1 Bm 1 Am 2m
3m
4m
collec-
tive
2
me-
dium
often max. load, but continuously small loads
0,50 < k < 0,63
1 Em* 1 Dm 1 Cm 1 Bm 1 Am 2m
3m
4m
5m
3
heavy
frequent max. load, continuously average loads
0,63 < k < 0,80
1 Dm 1 Cm 1 Bm 1 Am 2m
3m
4m
5m
4
very
heavy
continuously max. load and adjacent loads
0,80 < k < 1,00
1 Cm 1 Bm 1 Am 2m
3m
4m
5m
Calculated operating times acc. to FEM 9.755
DIN 15020/1 FEM 9.511
Drive group
ISO 4308/1; SO 4301/1
1Em
*
1Dm
M 1
1Cm
M 2
1Bm
M 3
1Am
M 4
2 m
M 5
3 m
M 6
4 m
M 7
5 m
M 8
line
Load collective
factor of the load spectrum
calculated operation time D (h)
1
light 1 - L1
k = 0,5 (km1 = 0,125 = 0,5
3
)
(400)*
800 1600 3200 6300 12500
25000
50000 100000
2
medium 2 - L2
0,5 < k < 0,63 (km1 = 0,25 = 0,63
3
)
(200)*
400 800 1600
3200
6300
12500
25000
50000
3
heavy 3 - L3
0,63 < k < 0,8 (km1 = 0,5 = 0,8
3
)
(100)*
200 400 800 1600
3200
6300
12500
25000
4
very heavy 4- L4
0,8 < k < 1,0 (km1 = 1 = 1,0
3
)
(50)* 100 200 400 800 1600
3200
6300
12500
*)
not included in FEM 9.511
Apart from drive groups, the rope has to be checked and serviced regularly acc.g to DIN15020, if
necessary, replace.
By comparing those data with the actual operating conditions and times the consumed part of the calculated
operating time can be determined
The consumed part of the calculated operation has to be recorded by the operator (i.e. writing,
counting, measuring)
After expire of the calculated working life the winch has to be given a thorough examination 1)
1)
only by manufacturer or competent personnel authorised by manufacturer
type of brake
∆
n=100 min-1
release path
SLü [mm]
MK [Nm]
nominal
±
0,05mm
max.
P 5
0,2
0,5
L 4
0,2
0,5
L 8
0,2
0,5
L 16
0,2
0,5
L 32
0,3
0,7
Special adjusting are to be demanded!