1
1. GENERAL INFORMATION
The NPM NOVA Premix
f
burner employs a fully premixed high swirl stabilized combustion head
technology to provide proven low NO
X
emissions for sub 30 PPM applications and superior flame
retention. NO
X
emissions lower than 30 PPM can be obtained by running at slightly higher 0
2
levels. The
NPM burner is designed to fire natural gas and propane against a positive, balanced or negative furnace
pressure.
The burner is a self-contained unit comprised of a blower assembly, firing head, ignition system, and
flame safeguard control panel. As with any premix burner the excess 0
2
operating range is narrower than
those of a conventional nozzle mix gas burner. Therefore, during setup care should be exercised in
obtaining an excess 0
2
reading of not less than 2% or more than 7%.
All Power Flame burners are operationally fire tested at the factory.
2. CAPACITIES & SPECIFICATIONS
Model Number
NPM15-10-24
NPM15-10-120
NPM30A-12-120 NPM30-12-120 NPM50-15-120
Natural/LP Gas Flow
300-720
300-850
390-1,100
480-1,260
825-2,200
X 1,000 BTU/HR
Gas Train Size
1”
1”
1-1/4”
1-1/4”
1-1/2”
Blower Wheel Size
7” x 3”
7” x 3”
7” x 3”
8-1/4” x 1-1/2”
9-1/8” x 2-1/2”
Blower Motor HP
1/4”
1/4”
1/2“
1/2”
1”
Motor Voltage
120/60 Hz
120/60 Hz
120/60 Hz
120/60 Hz
120/60Hz
Control Voltage
24 V
120 V
120 V
120 V
120 V
Inlet Pressure
To Main Shut-off
Cock Inches
W.C. Min. / Max.
6.8/14.0
6.7/14.0
7.3/14.0
8.2/14.0
11.6/14.0
3. ACCEPTANCE PROCEDURE
Uncrate burner carefully and check all parts received against your computer generated Bill of Material
that is enclosed in the owner’s information envelope.
Warranty
The Owners Information envelope packed with the burner contains a Warranty Registration Card. The
Warranty Registration Card is also a request form for a Spare Parts List. An on-hand supply of spare
parts is highly recommended in case of emergency shutdown. We request that you complete and return
the card to Power Flame in the enclosed self-addressed envelope or you can register on line at
www.powerflame.com as soon as possible.
4. INSTALLATION
Prior to Installation, Carefully read this Installation and Operation Manual, Review All Charts, Drawings
and Diagrams Shipped with the Burner. Installation must be in accordance with all local and national
codes including CAN1-B149.1 or B149.2 and Canadian electrical codes for Canadian installations.