THE OTHER DOOR
®
GENERATION II STEEL CRATE • PG5927B/PG5936B/PG5942B
2
PARTS LIST
CRATE ASSEMBLY
Step 1. Remove from box and carry bag.
Step 2. Place crate on ground as shown, so
the
PET GEAR
logo on the bottom (black part)
is facing toward you. (Figure A.)
Top Locks.
One on each side.
Crate
Matching
Bolster Pad
Wheels
Handle
A.
B.
Check that you have all the parts shown BEFORE assembling your product.
If any parts are missing, call Customer Service.
Logo
Step 3. Lift top up to a ninety degree angle. (Figure B.)
Carry Bag