
INSTALLATION
Step 5.
Place the Upper Joints on the
vertically assembled Tubes.
Repeat this for the 6 vertically
assembled Tubes.
Step 6.
Connect Tubes on the top level
by inserting the ends of the
Tubes into 6 x Upper Joints.
Repeat for the 6 corners.
Step 7.
Place and wrap around upper
fabric over the vertically
assembled Tubes.
Step 8.
Turn over the upper Fabric and
cover the top Tubes. Secure
velcro tab around Tube to keep
in place.
08