Perlight Solar IRT Integrated Roof Tile Installation Manual
17
www.perlight.com
V.03.2021 C2.6
Installation Steps (Example)
Installation of Top flashings
Installation of the top flashings uses three types of flashing:
Flashing-Top Mid (3-1)
,
Flashing-Top Left (3-2)
,
and
Flashing-Top Right (3-3)
, which can be installed
from Left to Right or Right to Left.
Start with one corner, then install the Flashing-Top Mid (3-1) before installing the opposite corner.
All three types have the same structure as the clamping parts of the module Lower Frames. The Flashing-Top
Left (3-2) and Flashing-Top Right (3-3) are symmetrical in shape, and the installation method and function are
the same. Compared with the Flashing-Top (3-1), the left and right virticle extension parts are added, which are
inserted into the Flashing-Side Left (3-4) and the Flashing-Side Right (3-5) of the system to form an overlapping
water drainage path.
Each Top flashing has a profile, which is similar in shape and size to
the profile of the module Lower Frame and connects in the same way
to the Upper Frame of the modules in the top row of the array.
The illustration on the left shows how the Top flashings clamp to the
module Upper Frame.
The virticle extension of the Flashing Top-Left & Top-Right, slide
into the side flashings as shown in the figure on the left. Top-Left &
Top-Right flashings overlap the side flashings to create a drainage
channel.