
PERLICK RESIDENTIAL
RS-CDK
INSTALLATION INSTRUCTIONS
6
| perlick.com/residential
INSTALLATION
INSTALLATION OF DISPENSING EQUIPMENT
Open the tapping kit box and become familiar with its
components. If the dispensing head is going to be mounted on
a counter top directly above the refrigerated cabinet, have the
counter top pre-drilled using the supplied template on page 12.
Make sure that the access hole in the refrigerated cabinet is in
line with the counter top holes. Remove any obstructions from
the access hole of the refrigerator.
Follow instructions on pages 8 through 11 to properly install the
tapping equipment on your Perlick unit, or watch our Beer
Dispenser Tapping Installation video.
NOTE:
Wash tapping devices thoroughly.
Flush beer
and faucet lines, as well as the tapping device (keg
coupler) with fresh water.
IF YOU ARE INSTALLING A DRAFT ARM - SKIP TO PAGE 8. THE FOLLOWING INSTRUCTIONS ARE
ADDITIONAL PREPARATION STEPS FOR THE ADARA DISPENSING HEAD ONLY
1. Mark the air tube for correct length dependent upon your installation scenario. If installing directly on top of the refrigerated
cabinet, make a mark 5 inches from the bottom of the tower (Figure 1). If installing directly on top of a countertop, add the
depth of the countertop to the original 5 inches and mark at that new dimension (Figure 2).
Figure 1.
Figure 2.