
Perle MCR200 Guide
5
1.
Loosen the Captive retainer screw on the front of the
module and gently pull it towards you.
2.
Once remove you will have access to any jumpers or
DIP switches on the Module that may need to be set.
3.
If not re-inserting or replacing the Media Converter or
management Module then cover the opening slot with a
face plate and secure the screw.
Note: Blanking face plates are available as an accessory.
Grounding the MCR200 Chassis (Optional)
If your installation requires additional grounding the following
procedure can be followed.
Grounding the chassis requires the following items:
•
One grounding lug (not provided)
•
One 18 - 12 AWG wire (not provided)
•
Cross-head screwdriver (not provided)
Note: For your safety, when installing this equipment, always
ensure that the chassis ground connection is installed first and
disconnected last.