Warnings and Safety Information . 25
System Requirements
Give attention to the following points before installing the Spotlight 200.
Electrical Requirements
The power consumption of the microscope does not exceed 75 VA.
The power consumption of the stage controller does not exceed 60 VA.
The nominal power consumption of the spectrometer is 120 VA (65 VA for the Spectrum
Two).
The line supply must be within 10% of the nominal voltage. For example, 230 V ± 10%.
If possible, do not connect any parts of the Spotlight 200 to circuits that have heavy duty
equipment, such as large motors, connected.
If possible, do not use photocopiers, discharge lamps, radio transmitters, and other
equipment with large or frequent transient loads, on the same supply circuit.
Microscope
The microscope can operate on electricity supplies of 50 or 60 Hz and in a voltage range of
100 to 240 V. The primary fuse (2 A T, 250 V, part number 04970839) for the microscope is
in the drawer on the mains inlet connector.
NOTE:
No voltage selection is required.
Stage Controller
The stage controller can operate on electricity supplies of 50 or 60 Hz and in a voltage range
of 100 to 240 V. No voltage selection is required. The primary fuse (1.6 A T, 250 V, part
number 09991641) is located in a drawer on the mains inlet.
NOTE:
No voltage selection is required.
Summary of Contents for Spotlight 200
Page 1: ...Spotlight 200 User s Guide MOLECULAR SPECTROSCOPY...
Page 6: ...6 Spotlight 200 User s Guide...
Page 7: ...Introduction...
Page 13: ...Warnings and Safety Information...
Page 28: ...28 Spotlight 200 User s Guide...
Page 29: ...Overview of the Spotlight 200...
Page 40: ...40 Spotlight 200 User s Guide...
Page 41: ...Getting Ready to Use the Spotlight 200...
Page 51: ...Preparing Samples...
Page 65: ...Techniques for Collecting Spectra...
Page 112: ...Maintenance...
Page 126: ...126 Spotlight 200 User s Guide...
Page 127: ...Appendices...