Filling the cooling system
The cooling system is self-priming; air in the system is removed automatically as
the cooling system operates. The coolant is a 1:10 solution of glycerol in water
(1 part glycerol plus 9 parts water).
Note:
The cooling system contains 0.5 L glycerol when it leaves the factory.
(See ‘Cooling system maintenance procedures’ in the Graphite Furnace User’s
Guide for the procedure to follow when you empty and refill the cooling system.
Do not use antifreeze.)
.
1. Remove the stopper from the top of the
cooling system – twist and pull.
2. Fill the system to the
Max
mark with
sediment-free drinking water – about
4.5 L.
Do not use deionized water since this can
cause corrosion.
3. Replace the stopper securely.
Water level indicator
Max
Min
Summary of Contents for AAnalyst 700
Page 2: ......
Page 3: ...ATOMIC SPECTROMETRY AAnalyst 700 Atomic Absorption Spectrometer User s Guide...
Page 8: ...Contents C 4 0993 5255...
Page 10: ...1 2 0993 5255...
Page 44: ...Safety Regulatory Information 1 36 0993 5255...
Page 46: ...Spectrometer Installation 2 2 0993 5255...
Page 68: ...Spectrometer Installation 2 24 0993 5255...
Page 70: ...Preparing the System 3 2 0993 5255...
Page 84: ...System Maintenance 4 2 0993 5255...
Page 98: ...Parts and Supplies 5 2 0993 5255...
Page 102: ...Laboratory Requirements 6 2 0993 5255...
Page 120: ...Spectrometer System Description 7 2 0993 5255...
Page 136: ...Translations of Warnings 8 2 0993 5255...
Page 146: ...Translations of Warnings 8 12 0993 5255...
Page 185: ...0993 5255 In 1 Index...
Page 186: ...Index In 2 0993 5255...
Page 192: ......
Page 193: ......