background image

Elizabethtown College Department of Chemistry 

Last Updated by KK 1/09 

 

15.

 

Close the Manual Analysis window.  To view the calibration curve, select Calib.  To view the 
results of the sample analysis, select Results.  To retrieve the last page of the printed output, select 
New Page from the Print command list.  Affix printed hard copies into your notebook. 
 

16.

 

SHUTDOWN PROCEDURES 

a.

 

After the final solution has been aspirated, allow at least three minutes of pure 
deionized water to aspirate through the burner head to remove all reagents. 

b.

 

Open the Flame Control window, and click on the Flame icon.  The system will 
automatically extinguish the flame safely. 

c.

 

Turn off the burner gas supplies to the spectrometer. 

d.

 

In the Flame Control window, click on the Bleed Gases button to depressurize the 
gas lines. 

e.

 

Wait at least 10 minutes after you have extinguished the flame, and then turn off the 
fume ventilation system using the switch behind the instrument. 

f.

 

Exit the software and Windows, and turn off the spectrometer, the computer, and the 
printer. 

g.

 

Empty the drain vessel, being certain to dispose of waste properly. 

h.

 

Store samples and standards or dispose of them properly.  They should not be left 
near the instrument. 

i.

 

Double check that you carried out each of steps 16a-h before exiting the lab. 

 

FOR GRAPHITE FURNACE MEASUREMENTS: 
 

9.

 

Turn on the Argon supply, and adjust the output to 50 psi.   
 

10.

 

Assure that the PE Accessory Cooling System (found below the instrument) is on and that the 
water level is in the appropriate range for use. 

 
11.

 

Turn on the power to the Furnace using the switch on the left-hand side of the instrument. 

 
12.

 

On the computer, select and launch the AA WinLab Analyst Software.  The software will initialize 
and establish communication with the spectrometer and the graphite furnace.  When prompted, 
select “Use the basic system procedure for…” and choose the setup designated by your instructor.  
Alternatively, you may develop your own setup by consulting the appropriate section in the 
instrument manual. 

 
13.

 

If necessary,  

a.

 

align the lamp according to the procedures outlined in the 

AA Winlab Software 

Guide for Atomic Absorption Spectroscopy

, Section 3-3. 

b.

 

check the graphite tube in the furnace as described in the 

HGA-800 Graphite 

Furnace System including the AS-72 Autosampler Hardware Guide

, Section 2-19. 

c.

 

condition the graphite tube as described in the 

HGA-800 Graphite Furnace System 

including the AS-72 Autosampler Hardware Guide

, Section 2-15. 

d.

 

fill and prime the rinsing system as described in the 

HGA-800 Graphite Furnace 

System including the AS-72 Autosampler Hardware Guide

, Section 2-27. 

e.

 

align the autosampler arm as described in the 

HGA-800 Graphite Furnace System 

including the AS-72 Autosampler Hardware Guide

, Section 2-28. 

Summary of Contents for AAnalyst 300

Page 1: ...ence Spectroscopy in Principles of Instrumental Analysis 6th Ed by Skoog Holler and Crouch For specific sample methods consult the Perkin Elmer Manuals o Analytical Methods for Atomic Absorption Spectrophotometry o Analytical Techniques for Graphite Furnace AAS o Graphite Furnace AAS A Source Book For software related applications consult the Perkin Elmer Manual AA Winlab Software Guide for Atomic...

Page 2: ...For graphite furnace measurements assure that the pipet for the autosampler is connected to the tubing that flows to an appropriate solvent in the solvent bottle to the left of the instrument 4 Under the supervision of or with permission from an instructor install in the turret the appropriate hollow cathode lamp HCL for the element you wish to analyze Record the maximum operating current somewher...

Page 3: ...r supply and adjust the outlet pressure to 60 psi or that which you determined from the literature b Turn on the acetylene supply and adjust the outlet pressure to 13 14 psi or that which you determined from the literature 13 Double check that you know the location of the fire extinguisher and then select Flame from the Toolbar and light the burner Close the flame control window and make certain t...

Page 4: ...e exiting the lab FOR GRAPHITE FURNACE MEASUREMENTS 9 Turn on the Argon supply and adjust the output to 50 psi 10 Assure that the PE Accessory Cooling System found below the instrument is on and that the water level is in the appropriate range for use 11 Turn on the power to the Furnace using the switch on the left hand side of the instrument 12 On the computer select and launch the AA WinLab Anal...

Page 5: ...s for the blank standards and samples c Record the peak areas in your notebook and affix printed hard copies into your notebook as well 15 SHUTDOWN PROCEDURES a Flush the autosampler rinsing system with deionized water by selecting Flush Sampler from the Furnace Control Window Exit the software and Windows and turn off the graphite furnace unit the spectrometer the computer and the printer c Turn ...

Reviews: