background image

Install 
Instrument 
with 1.5m free 
space (from 
widest point) 
around it.

1.5m

1.5m

Surface Fixed

Babel Drum
Page 1 of 2

1. Unpack ground fixing legs 
3no.

Installation Instructions

Played with hands

22 Kg

13.4 Kg

Ground Fix
Components:

Weight of heaviest part 

17.5kg

(Large Babel Drum)

Weight of heaviest part 

13.4kg

(Small Babel Drum)

BS EN 1176

Metric Conversion:
850mm/ 33 

15/32

855mm/ 33

21/32

1.5m/ 59”

CAUTION: Drum 
surface can get hot 
in direct sunlight, if 
possible install in 
shaded areas.

2. Lay packaging out on floor 
or assemble on non-abrasive 
surface to prevent marking of 
polished stainless steel.

3. Align holes on legs to holes 
on surface fixing(opposite 
end to polished domes) and 
secure in place using 3no. 
M10 x 30mm Screws 
provided
Tools required TX 45 Driver 
Bit)

4. Invert assembled frame so 
domed ends face upwards.

5. Place 8mm Hex Key 
supplied into hole in leg and 
lock into internal bolt.

6. Remove Black Cap 
opposite side of leg and 
keeping Hex Key in place, 
slide black polyurethane 
damper over bolt until flush 
with end of bolt. Repeat for 
other 2 legs

8. Align holes in side of babel 
drum with bolts on legs.

9. Using 8mm Hex Key screw 
bolts into drum to secure in 
place.
Use thread locking solution
All hole locations are laser cut 
for accuracy to ensure holes 
in drum align perfectly with 
legs.

7. Unpack babel drum leaving 
black film in place to protect.

10. Using TX40 driver 
provided secure M8 x 25mm 
security bolts into external 
holes in legs 3no. Use thread 
lock solution

Instrument
Components:

M8x25mm Pin Torx

x3

Ground Surface

850mm from Plate

Large 8 note

Small 6 note

11.Locate Babel Drum in 
desired location and mark 
holes to fix to desired surface.

12. Fix to Surface using 
recommended ground 
anchors (Ground Anchors are 
not supplied)

13. Make sure all fixings are 
covered and secure using 
cover caps provided

M10x30 Security Screw

x3 

2 Part Cover Cap

x4 

Ground Anchors 
not supplied

Spares available from  

percussionplay.com 

or from your 

local distributor

855mm from Plate

Summary of Contents for PPBDL-S

Page 1: ...t 6 Remove Black Cap opposite side of leg and keeping Hex Key in place slide black polyurethane damper over bolt until flush with end of bolt Repeat for other 2 legs 8 Align holes in side of babel dru...

Page 2: ...gs with caps provided Surface Fixed Babel Drum Page 2 of 2 Assembly Guide PPBDL S Played with hands Instrument Components Ground Fix Components 22 Kg 13 4 Kg BS EN 1176 M8x25mm Pin Torx x3 1 2 3 Threa...

Page 3: ...et hot in direct sunlight if possible install in shaded areas 2 Part Cover Cap x4 1 Attach Surface Fixing posts to legs See Surface Fix Post InstallationSheet 3 Fix Surface Plate to level surface usin...

Page 4: ...ng loose Fix Surface Plate to the ground surface Ground Anchors Not provided cover fixings with caps provided Surface Fixed Components Surface Fix Post Installation 1 1 1 2 3 Bell Lyre Page 2 of 2 M10...

Page 5: ...und it 1 5m 1 5m Weight of heaviest part 20kg Handpipes BS EN 1176 Metric Conversion 250mm 10 400mm 16 905mm 35 1 5m 59 Played with hands Instrument assembled Surface Fix Components M10 Barrel Nut x2...

Page 6: ...Handpipes Page 2 of 3 BS EN 1176 Thread Lock Solution Required Not Supplied Played with hands Instrument Components Instrument assembled M10 Barrel Nut x2 M10x50 Security Screw x2 Ground Anchors not...

Page 7: ...instrument Fix instrument to Surface fix plate using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose Fix Surface Plate to the ground surface Ground Anchors Not...

Page 8: ...nd secure in place using 3no M10 x 200mm threaded bar and 6no M10 nuts provided Tools required 2no 17mm metric spanner wrench 11 16 inch or alternatively using adjustable wrench 4 Invert assembled fra...

Page 9: ...rface Fixed Instrument Components M6x20 Security Screw x6 M6 Saddle Strap x3 TX 30 Driver Bit x1 Assembly Guide PPHARM Surface Fix Components 20 Kg Pair Small Red Beaters X1 Harmony Flat Pack Page 2 o...

Page 10: ...e in desired location before attaching the bells Fix lower sections to surface using pre drilled holes provided Surface Anchors Not supplied Recommended M10 Female Rawl Bolts or chemical anchors Spare...

Page 11: ...N 1176 Surface Fix Components Spares availablefrom percussionplay com or from your local distributor Pair Large Red Beaters X1 M10 Barrel Nut x9 M10x40 Security Screw x9 M10x16 CSK Security Screw x34...

Page 12: ...om percussionplay com or from your local distributor Pair Large Red Beaters X1 M10 Barrel Nut x9 M10x40 Security Screw x9 M8x16 CSK Security Screw x34 Mount this section of each base to the deck Deck...

Page 13: ...percussionplay com or from your local distributor Pair Large Red Beaters X1 M10 Barrel Nut x9 M10x40 Security Screw x9 M8x16 CSK Security Screw x34 Join the upper and lower base sections with CSK M8x1...

Page 14: ...8 Spares availablefrom percussionplay com or from your local distributor M10 Barrel Nut x9 M10x40 Security Screw x9 2 Part Cover Cap x36 1 Attach Surface Fixing plates to each of the 9 legs 1 2 3 Fix...

Page 15: ...trument to Surface fix plate using M10 bolt and Barrel Nut and use thread locking solution to prevent fixings working loose Fix Surface Plate to the ground surface Ground Anchors Not provided cover fi...

Reviews: