background image

             

Ground Fixed 

5

. Once happy with location of 

the Instrument, 

fill 

hole using 

rapid hardening 

concrete

. Be 

sure to compact concrete 
around legs and leave to dry 
according to manufactures 
guidelines, making sure to 
leave jig in place until set. 

2

. Use wooden jig to mark out 

hole positions for each of the 3 
legs in desired location upon 
decision from customer. .

 

 

3

.

Excavate 3 holes 

for the 

Steel legs 

250mm diameter by 

400mm deep

(See GF Post 

Installation Sheet) 

4

. Locate (lower) legs into 

holes making sure they are 
vertical and level  and use jig 
to check positioning 

 

 

1

. Attach M10x150 Bar and 

Nuts to each of the 3 Legs. 

(1.1) (See Assembly Guide) 

 

 400mm

  

Ground Surface

  

1110 

Installation Instructions 

(1.1) 

 

 

Instrument  
Components: 

M10x150 Bolt

  

x6  

M10 Nut

  

x12  

Ground Fix  
Components: 

Install Instrument 
with 1.5m free space 
(from widest point) 
around it.

  

1.5m

  

1.5m

  

Papilio Bells 

Page 1 of 3 

 
 

Weight of heaviest part 

13kg

 (Notes) 

 

BS EN 1176

  

36 Kg 

M8 Barrel Nuts

  

x8 

 

(1.1) 

 

6

. Once concrete has set, 

remove wooden jig and install 
notes using M8 Barrel nuts 
provided. Finally install 
beaters using fixings provided. 

(See Assembly Guide) 

 

M6x20mm 

Secure Screw 

X8 

Eye Straps 

X4 

Pair Small Red 

Beaters X4 

Metric Conversion: 
250mm/ 10” 
400mm/ 16” 
1110mm/ 44” 
1.5m/ 59” 

CAUTION: Papilio 
surface can get hot 
in direct sunlight, if 
possible install in 
shaded areas. 

Spares available form  

percussionplay.com 

or from your 

local distributor 

Reviews: