background image

Ground Fix Installation 

(1.1) 

 

 

Ground Fixed 

BS EN 1176

  

Freechimes  

Symphony 

Page 4 of  4 

Foundations should not present a hazard. These foundations are 
recommended as a guide, for more information on foundation 
details for various surface see Part 7 of BS EN 1176. 

M10 BZP Nut 

X8 

M10x200mm 

BZP Bar  

X4 

 

Components: 

Carefully lay 3 x legs on a level surface. Line up pre drilled holes in the backboards with
the legs and ensure the instrument is aligned square with the legs. Fix in place using
M8x40mm screws supplied

Excavate 3 holes with a 250mm diameter tapering down to 350mm diameter and 650mm depth

Compact base of hole with 50mm of aggregate. Lower ground Fix posts attached to instrument into

hole (check instrument straight and level, and at correct height before filling with concrete)

50

600

Fill holes with fast drying concrete to manufacturers specifications. If posts protrude above
instrument they can be cut down

Summary of Contents for OPC300

Page 1: ...aking sure they are vertical and level prior to concreting in place Installation Instructions 4 Once happy with location and levels fill holes using rapid hardening concrete Be sure to compact concrete around legs and leave to dry according to manufactures guidelines 5 Beaters can be fixed to Stainless Steel posts with fixings provided KS2 KS2 850mm Ground Surface Spares available form percussionp...

Page 2: ... 1176 Pair Small Beaters X3 Freechimes Symphony Page 2 of 4 COMPONENTS LIST Saddle Strap X3 M8 Lock washer X10 M8x40 Pin torx X10 M10 Nut X12 M10x200 Threaded Bar X6 M6x20 Pin torx X6 TX 40 Driver Bit x1 TX 30 Driver Bit x1 Tools Components M6x20mm Secure Screw X6 Eye Straps X3 M8x40mm Secure Screw X10 M8 Lock Washer X10 ...

Page 3: ...ZP Bar X4 Components Carefully lay 3 x legs on a level surface Line up pre drilled holes in the backboards with the legs and ensure the instrument is aligned square with the legs Fix in place using M8x40mm screws supplied Excavate 3 holes with a 250mm diameter tapering down to 350mm diameter and 650mm depth 50 600 ...

Page 4: ...p pre drilled holes in the backboards with the legs and ensure the instrument is aligned square with the legs Fix in place using M8x40mm screws supplied Excavate 3 holes with a 250mm diameter tapering down to 350mm diameter and 650mm depth Compact base of hole with 50mm of aggregate Lower ground Fix posts attached to instrument into hole check instrument straight and level and at correct height be...

Reviews: