Assembly & Operation Manual
20
7
SAFETY REQUIREMENTS
7.1 Installation safety requirements
The installation should be carried out only by the qualified personnel after careful study of
this
Manual
.
Warning!
•
All the cables
should be connected up when the power supply is switched off
from the AC mains.
•
Only serviceable tools should be used for installation.
•
Observe general electrical safety rules when laying out the cables.
•
Before the turnstile first power on make sure its installation and connection have
been made accordingly.
Power supply unit installation must be made in accordance with the safety rules stipulated
in its certificate.
7.2 Operation safety requirements
Observe general electrical safety rules when operating the turnstile.
Warning!
•
Do not use the turnstile under conditions that do not comply
with the requirements of Chapter 2 of this Manual.
•
Do not use the turnstile at supply voltage that does not comply
with the requirements of Chapter 3 of the Manual.
Safety requirements on the power supply units operation are shown in their certificates.
Summary of Contents for TTD-08A
Page 1: ......
Page 38: ...www perco com export perco ru ...