PER-EKO type KSW & KSW PLUS – Instruction Manual 

 

 

More serious repairs resulting from a faulty usage, ensuing breakdowns or mechanical breakdowns, ought to be 

carried out immediately after having been certified.  
 

 

5.6 Transportation instruction 

 

The KSW boilers are delivered in a fully assembled state. The furnace lever is fixed in a transportation-adapted 

position. For the transportation purposes, the boiler is placed on a wooden pallet and secured with plastic wrap.  
 

 

5.7 Final remarks 

 

The fundamental feature of the central heating boilers type KSW & KSW PLUS is their construction, which 

guarantees high efficiency with comparatively low fuel consumption. The boilers are always accompanied with a warranty 
card which is to be demanded each time the boiler is purchased.  
 

With regards to service repairs, the first step is to contact the manufacturer stating the boiler factory number and 

type and the boiler production year. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for KSW

Page 1: ......

Page 2: ... 3 BOILER EQUIPMENT 7 4 BOILER INSTALLATION MANUAL 7 4 1 Boiler set up 7 4 2 Boiler connection to the chimney 7 4 3 Supplementation of the boiler with central heating water 8 4 3 1 Information on terms and conditions enclosed in the PN 91 B 02413 norm 8 5 BOILER OPERATION MANUAL 8 5 1 Water filling 8 5 2 Ignition of the boiler 9 Boiler type KSW 9 Boiler type KSW PLUS 9 5 3 Burning fuels in the boi...

Page 3: ...95 C The boilers belong to a group of low temperature boilers and are not subject to registration in the District Office of Technical Supervision The boilers are meant to operate in central heating water systems with gravitational or forced circulation in an open thermal cycle both having all the safety features in accordance with the requirements of the PN 91 B 02413 norms which relate to the sec...

Page 4: ...10 Boiler water capcity dcm3 20 28 38 52 55 70 96 95 105 125 Heat exchanger material Steel P265GH PN EN 10028 thickness 5 mm Max working pressure MPa 0 15 Required min chimney draught Pa 20 23 25 28 35 Water temperature min max C 57 95 Voltage Power V W 230 85 Boiler weight excl water kg 113 125 160 174 186 220 270 305 331 380 Water supply pipe diameter cal G11 2 features only in PLUS version PN E...

Page 5: ...hambers have got one door equipped with a flap which controls the air inflow 2 3 Flue The boiler has a welded flue which is responsible for transferring the fumes from the boiler to the environment The flue also has a smoke throttle responsible for controlling chimney draught 2 4 Insulation panels Located on the surface of the water main body the insulation panels limit the boiler s heat loss to t...

Page 6: ...PER EKO type KSW KSW PLUS Instruction Manual 6 ...

Page 7: ...boiler room should not be smaller than 1m The utility room in which the boiler is to be situated ought to have 2 air holes ventilation duct with a diameter not smaller than 50 of the chimney diameter surface efferent duct with a diameter not smaller than 140x140mm with an inlet hole under the ceiling of the boiler room 4 2 Boiler connection to the chimney The flue is to be attached to the chimney ...

Page 8: ...ces The inner diameter of the safety pipe ought to be at least 25mm The inner diameter of the expansion pipe ought to be at least 25mm The safety pipe and the expansion pipes with the exception of vertical sections ought to be run without bends with a decrease of at least 1 towards the boiler changes in directions of pipes ought to be carried out using arcs with the axis radius of at least 2d wher...

Page 9: ...n has started the system goes into the lighting mode This will activate the fan which will increase its operation gradually until finally reaching its preset working parameters these parameters are to be set according to the controller s instruction manual After reaching the temperature of 30 2 C the controller automatically activates the circulation pump In order to deactivate the controller a ST...

Page 10: ...ange the fuel to a highly calorific one lack of air inflowto the boiler room allow the air inflow through a window or a ventilation duct controller or fan breakdown set the parameters once again according to the instruction manual or change to a new one Low heat efficiency of the boiler pollution of the fume ducts in the smoke tube chamber clean the ducts adjust the throttle using wood as the main...

Page 11: ...n For the transportation purposes the boiler is placed on a wooden pallet and secured with plastic wrap 5 7 Final remarks The fundamental feature of the central heating boilers type KSW KSW PLUS is their construction which guarantees high efficiency with comparatively low fuel consumption The boilers are always accompanied with a warranty card which is to be demanded each time the boiler is purcha...

Page 12: ...ler is subject to exchange once it has been declared by the factory that the boiler cannot be repaired The warranty card is the only document that allows the client to have the boiler repaired free of charge Quality complaints are to be declared in the nearest selling outlet or directly to the company using the address provided in the warranty card The warranty does not apply to draught regulator ...