Installation Guide
Peppers Cable Glands Limited
Stanhope Road, Camberley,
Surrey, GU15 3BT, UK
CT0033 V1.0
CR-C*** Type Installation Guide
17. The equipment should not be energised until the compound has been left to cure for at least
4 hours when working at 21º C. See the chart ‘Energising Time vs. Temperature’ for further
guidance.