Pentax EPK-P Service Manual Download Page 10

 

- 8 -

 

6.3 Electrical adjustment 

Preparation   

Set a jumper to 

STB2

 to disengage the lamp internal lock switch, and set Jig mode by putting a jumper to 

STB3

. Refer to Photo-5. 

Note: When opening the cover, it is necessary to remove the screw which is available under the lamp house lid.   

6.3.1 Iris adjustment (necessary when the iris unit or Process board was replaced) 

6.3.1-1 Hole element current adjustment 

1) Connect the probes of the meter to 

TP25

(+) and 

TP26

(common). 

2) Adjust 

VR500

 so that the voltage attains 

+/-20mV

6.3.1-2 Iris position adjustment 

1) Press “

EXPOSURE CONTROL

” button on the front panel to select the iris mode “

MANUAL

”. 

2) Press “

BRIGHTNESS down

” button on the front panel repeatedly until the brightness level becomes 

-5

”. 

3) Enter key command “

Ctrl+J

” (common between NTSC & PAL) to show the color bar chart. 

4) Adjust 

VR501

 so that the edge of the iris plate just touches Close position stopper bar (Left one as 

seen from the lamp side). Refer to Photo-6. 

5) Press “

BRIGHTNESS up

” button on the front panel repeatedly until the brightness level becomes “

+5

”. 

6) Enter key command “

Ctrl+J

” (common between NTSC & PAL) to show the color bar chart. 

7) Adjust 

VR502

 so that the edge of the iris plate just touches Close position stopper bar (Right hand side 

one as seen from the lamp side). Refer to Photo-6. 

8) Confirm if the iris plate stays in about the center between the two stoppers after selecting the 

brightness “

+/-0

” and the color bar chart is displayed by entering the key command “

Ctrl+J

”. Turn off 

and on the unit and turn on the lamp for the next confirmation. 

9) Connect a scope and check if the iris properly works in accordance with the iris manual operation 

(changing the brightness by pressing BRIGHTNESS button). 

10) Check if the iris properly works in iris auto mode. 
11) Turn off the unit and disconnect the jumpers set before. 
12) Put back the cover and perform the electrical safety tests. 

VR500 

VR502 

VR501 

TP26 

TP25 

STB2

STB3 

Photo-5 VR & TP on Process board

Close position stopper 

Open position stopper 

Edge of Iris plate   

Iris plate 

Photo-6 Iris position adjustment 

The iris is located behinds the scope 

connector and it is visible from above after 

removing the bridge plate (black plastic one). 

Summary of Contents for EPK-P

Page 1: ...SERVICE MANUAL Version 00 High cost performance Video Processor PENTAX EPK p type C MNL 049 00 September 4 2009...

Page 2: ...ew Parts list Notes for this Service Manual 1 This service manual must be handled as confidential Copy of the manual must be under your control In the case the maintenance contract expires the origina...

Page 3: ...steps each RGB 9pin D sub x 1 Y C OUT S terminal x 2 Composite BNC connecter x 1 Output signal Analog output Y BNC connecter x 1 Remote Stereo mini plug x 2 Keyboard 6 pin Mini DIN x1 Control signal...

Page 4: ...es The image can be mirrored or rotated and displayed on the monitor In the case that the item Image Direction on Display tab of Configuration Screen actuated by pressing F10 key is set with MIRROR th...

Page 5: ...en the fan stops by accident it controls to shut down Lamp power supply PS4 6 DC power supply part Receives DC 12V and converts to 3 3V and 5V with the DC DC converter and the three terminal regulator...

Page 6: ...1 LP1 Lamp 2 LP2 Lamp selector SW3 Motor MOT1 Lamp rotary disk Sensor board O700 Lamp ON OFF control Iris control 12VDC Error detection Calculated signal for iris Pump control Scope lock Lamp control...

Page 7: ...p selector SW3 Lamp selector SW3 Iris unit MT1 Noise filter LF2 Front panel board F700 Fuse FU1 FU2 Mechanical block Integrated power supply unit PS4 Interlock switch SW2 Scope lock sensor PHC1 Proces...

Page 8: ...arts The procedures of disassembling the mechanical and electrical parts are not described in detail in the service manual Unless otherwise mentioned detach from the outer parts to the inner parts or...

Page 9: ...hat the lamp reflector settles the hole in the holder especially the protrusion meets the groove 6 Push the lamp holder tab until it latches 7 Close the lamp house with the lid by screwing the screw C...

Page 10: ...front panel repeatedly until the brightness level becomes 5 6 Enter key command Ctrl J common between NTSC PAL to show the color bar chart 7 Adjust VR502 so that the edge of the iris plate just touche...

Page 11: ...so that the air flow value indicated on the flow meter attains 2 5 0 1L min 7 Press PUMP POWER button repeatedly until the pump level High is selected 8 Press the up arrow key to select the pump leve...

Page 12: ...d neutral terminals of the AC cable Point B Equipotential terminal of the EPK p Point C Equipotential wire of the dummy scope for dielectric strength test Point D Video signal BNC connector outer shel...

Page 13: ...t A Point B AC input 4 Standard 1 Casing Leakage N C Connected Connected 110 VAC 100 A 1 2 N C 2 Connected Open 110 VAC 500 A 3 Protective earthing leakage S F C 3 Open Open 110 VAC 1000 A 4 N C Conne...

Page 14: ...itch and Process board E700 Or the switch itself may be defective Lamp wire B510 511 Confirm if B510 White is connected to Lamp1 and B511 Black is connected to Lamp2 If they are connected the wrong wa...

Page 15: ...ector Front panel board F700 Process board E700 Noise filter Power switch Integrated power supply unit PS1 Pump for Lamp Sensor board O700 Motor MOT1 Lamp selector SW3 CN9 CN3 CN1 Cable ID not availab...

Reviews: