![Pentair INTELLICHEM Series Instructions Download Page 2](http://html1.mh-extra.com/html/pentair/intellichem-series/intellichem-series_instructions_1524532002.webp)
- 2 -
Connecting the Pump to the IntelliChem Controller,
Using P/N 522478Z
1. Route the power cord(s) from the Pump(s) into the IntelliChem Controller
through the strain relief fitting(s) closest to the right hinge. Note:
Do not
overtighten the nuts.
2. Plug the power cord for the Acid pump into the left connector labeled “PH”
on the 522478 daughter board. See Figure 2.
3. (Optionally) plug the power cord for the Chlorine pump into the right
connector labeled “ORP” on the 522478 daughter board. See Figure 2.
4. Loosen the 4 screws in the J8/J11 terminal blocks on the IntelliChem
Controller board.
5. Install the 522478 daughter board so that all four pins are in the correct
holes in the J8/J11 terminal blocks. Tighten the four screws. See Figure 3.
6. Unplug the red wire harness going to J10 of the IntelliChem Controller
board, and connect it to J10 on the 522478 daughter board. See Figure 4.
7. Plug the wire harness from J10* of the 522478 daughter board to J10 of the
IntelliChem Controller board. See Figure 4.
Figure 2. pH and ORP Connection
Figure 3. Wiring Terminal Blocks
Plug Acid
Pump Here
Plug Chlorine
Pump Here
Figure 4. Power Connection
Wiring harness from Daughter Board
What is your
Hardware Setup?
pH ORP
[RELAY2 ICHLOR]
Wiring harness from Transformer