Installer manual Fleck 4600 SXT - Programming
54 / 100
Ref. MKT-IM-028 / C - 22.09.2020
6.5.2
Entering master programming mode
1. Press and hold
or
until the programming icon replaces the
service icon and the parameter display reads TD.
2. Set the time to 12:01 PM with
or
.
3. Press
to validate the selection and return to the service mode, or wait
for 10 seconds.
4. Press and hold
and
for 5 seconds until the programming icon
replaces the service icon and the display format screen appears.
6.5.3
Display format mode (DF)
Select the unit of measure.
Options:
• GAL: U.S. gallons and 12-Hour AM/PM;
• Ltr: litres and 24-Hour.
1. Press
or
to select the unit.
2. Press
to validate the selection and move to the next parameter.
6.5.4
Regeneration flow (RF)
Select the regeneration flow.
Options:
• dF1b: standard downflow single backwash (standard);
• Othr: other;
• UFtr: upflow filter (for 5000 filter);
• UFbd: upflow brine first;
• FLtr: filter, to be used with standard piston only (except 5000);
• dF2b: standard downflow double backwash.
1. Press
or
to select t the regeneration flow.
2. Press
to validate the selection and move to the next parameter.
6.5.5
Regeneration control type (CT)
Select the regeneration controller type.
Options:
• Fd: meter delayed;
• FI: meter immediate;
• tc: time clock;
• dAY: day of the week.