![Penman Collection Helios 8 Installation And Operating Instructions Manual Download Page 14](http://html1.mh-extra.com/html/penman-collection/helios-8/helios-8_installation-and-operating-instructions-manual_1523903014.webp)
14
been "authorised" and that appliances used to burn solid fuel in those areas
(other than "authorised" fuels) have been exempted for each area of
administration. Further information on the requirements of the Clean Air Act
can be found here: http://smokecontrol.defra.gov.uk/
This stove has been recommended as suitable for use in smoke control areas
when burning dry wood and the “authorised” smoke free solid fuels.
The “authorised” solid fuels you are permitted to burn in a smoke control zone
include: anthracite (this is naturally occurring smokeless fuel and is the test fuel
normally used and recommended), Ecoal 50, Homefire, Homefire ovals,
Phurnacite, Taybrite and Multiheat.
Refuelling Onto a Low Fire Bed
If the fire bed is not sufficient to light a new fuel charge, excessive smoke
emission can occur. Refuelling must be carried out onto a bed of glowing
embers and ash such that the new fuel ignites in a reasonable period. If there
are too few embers in the fire bed, add kindling to prevent excessive smoke.
Fuel overloading
The maximum amount of fuel specified in this manual should not be exceeded,
overloading can cause excess smoke.
Operation with door left open
Operation with the door open can cause excess smoke and will reduce the
efficiency of the stove by up to 50% (as well as presenting an obvious fire risk).
The appliance must not be operated with the appliance door left open except as
directed in the instructions.
Dampers left open
Operation with the air controls or appliance dampers open can cause excess
smoke. The appliance must not be operated with air controls, appliance
dampers or door left open except as directed in the instructions.
GENERAL MAINTENANCE (o
nly ever carry out maintenance when the stove is cold).
The following elements of maintenance may be carried out by the householder.
Any structural repairs, e.g. panel, collar or stove pipe replacement must be
carried out by a suitably qualified installer.