![PenBarry ZQ110L-GPE Installation Manual Download Page 6](http://html1.mh-extra.com/html/penbarry/zq110l-gpe/zq110l-gpe_installation-manual_1523689006.webp)
Page 6
1
2
3
1
New Construction Installation
6
Insert Mask and
Finish Ceiling
7
Install Grille
Mask protects unit
during construction.
Remove before
installing Grille.
• Install ceiling material.
• Cut out around Housing.
CAUTION
If the blower was unplugged, power must be
disconnected (see page 2, WARNING item 2)
before inserting motor plugs into control assembly.
IN ORDER TO PREVENT MOTOR/CONTROL DAMAGE:
1
2
3
1
See Page 12 for Operations, Cleaning and Maintenance, and Troubleshooting.