18
INSTALL THE FLUE COLLECTOR
Boiler
Position
Position
Position
Position
Position
Position
Position
Position
Position
Model
1
2
3
4
5
6
7
8
9
Number
211A-04
14
—
—
—
—
—
—
—
—
211A-05
14A
—
—
—
—
—
—
—
—
211A-06
14B
—
—
—
—
—
—
—
—
211A-07
14
14
—
—
—
—
—
—
—
211A-08
14A
14
—
—
—
—
—
—
—
211A-09
14A
14A
—
—
—
—
—
—
—
211A-10
14B
14A
—
—
—
—
—
—
—
211A-11
14B
14B
—
—
—
—
—
—
—
211A-12
14A
14A
14
—
—
—
—
—
—
211A-13
14A
14A
14A
—
—
—
—
—
—
211A-14
14B
14A
14A
—
—
—
—
—
—
211A-15
14B
14A
14B
—
—
—
—
—
—
211A-16
14B
14B
14B
—
—
—
—
—
—
211A-17
14A
14A
14A
14A
—
—
—
—
—
211A-18
14B
14A
14A
14A
—
—
—
—
—
211A-19
14A
14B
14B
14A
—
—
—
—
—
211A-20
14B
14B
14B
14A
—
—
—
—
—
211A-21
14B
14B
14B
14B
—
—
—
—
—
211A-22
14B
14A
14A
14A
14A
—
—
—
—
211A-23
14B
14B
14A
14A
14A
—
—
—
—
211A-24
14B
14B
14B
14A
14A
—
—
—
—
211A-25
14B
14B
14B
14B
14A
—
—
—
—
211A-26
14B
14B
14B
14B
14B
—
—
—
—
211A-27
14B
14B
14A
14A
14A
14A
—
—
—
211A-28
14B
14B
14B
14A
14A
14A
—
—
—
211A-29
14B
14B
14B
14B
14A
14A
—
—
—
211A-30
14B
14B
14B
14B
14B
14A
—
—
—
211A-31
14B
14B
14B
14B
14B
14B
—
—
—
211A-32
14B
14B
14B
14A
14A
14A
14A
—
—
211A-33
14B
14B
14B
14B
14A
14A
14A
—
—
211A-34
14B
14B
14B
14B
14B
14A
14A
—
—
211A-35
14B
14B
14B
14B
14B
14B
14A
—
—
211A-36
14B
14B
14B
14B
14B
14B
14B
—
—
211A-37
14B
14B
14B
14B
14A
14A
14A
14A
—
211A-38
14A
14A
14A
14B
14B
14B
14B
14B
—
211A-39
14A
14A
14B
14B
14B
14B
14B
14B
—
211A-40
14A
14B
14B
14B
14B
14B
14B
14B
—
211A-41
14B
14B
14B
14B
14B
14B
14B
14B
—
211A-42
14A
14A
14A
14A
14B
14B
14B
14B
14B
211A-43
14A
14A
14A
14B
14B
14B
14B
14B
14B
211A-44
14A
14A
14B
14B
14B
14B
14B
14B
14B
211A-45
14A
14B
14B
14B
14B
14B
14B
14B
14B
211A-46
14B
14B
14B
14B
14B
14B
14B
14B
14B
Table 4.1: Flue Collector Section Location (From Left to Right Facing Front of Boiler) – Crates
Crates 14 = Part number GG-5000 Crate 14A = Part number GG-5000-1
Crate 14B = Part number GG-5000-2
Summary of Contents for 211A Series
Page 1: ...211A Boilers Steam Series Gas Installation Operation Maintenance Manual ...
Page 17: ...15 Figure 3 3 Assembling Sections on Base PLACE THE BOILER SECTIONS ...
Page 35: ...33 INSTALL CONTROLS AND TRIM Figure 8 2 Pressure Control Piping Fittings Included with Boiler ...
Page 40: ...38 WIRE THE BOILER Figure 9 2 Typical Wiring Standard Controls Low Voltage Gas Valves ...
Page 41: ...39 WIRE THE BOILER Figure 9 3 Typical Wiring Standard Controls 120 Volt Gas Valves ...
Page 51: ...49 BOILER RATINGS DIMENSIONS ...
Page 56: ...54 REPAIR PARTS SERIES 211A Figure 15 1 Boiler Assembly ...
Page 57: ...55 REPAIR PARTS SERIES 211A Figure 15 2 Base Assembly ...
Page 58: ...56 NOTES ...