9 of 13
ISSUED: 04-24-08 SHEET #: 055-9256-9 11-21-11
Installing Projector Mount
4
Installing PRS projector mount with wall installation:
Position PRS projector mount (
A
) to the orientation shown
in fi gure 4.1 and attach to horizontal mounting plate (
FF
) using two M5 x 16 mm socket pin screws (
GG
), four fl at
washers (
F
) and two locknuts (
KK
).
Installing PRS projector mount with ceiling installation:
Attach vertical mounting plate (
EE
) to PRS projector
mount (
A
) using two M5 x 16 mm socket pin screws (
GG
), four fl at washers (
F
) and two locknuts (
KK
) as shown in
fi gure 4.2.
NOTE:
Placing washer (
F
) and nut (
KK
) combination on inside of PRS projector mount fi rst while attaching
mounting bracket (
EE or FF
) can make installation easier as shown in fi gure 4.3.
fi g. 4.1
fi g. 4.2
fi g. 4.3
PLACE WASHER (
F
) AND
NUT (
KK
) COMBINATION
FIRST
KK
F
A
5
Ceiling installation:
Insert vertical mounting plate (
EE
) into inner channel (
CC
) with projector mount (
A
) in the
correct orientation shown in fi gure 5.1. Secure vertical mounting plate to inner channel using four socket pin screws
(
JJ
) as shown in fi gure 5.2.
fi g. 5.1
CC
EE
ARROW
INDICATES
FRONT OF
MOUNT
A
fi g. 5.2
JJ
EE
CC
GG
EE
ARROW INDICATES
FRONT OF MOUNT
CEILING INSTALLATION
A
F
KK
F
WALL INSTALLATION
(EXCEPT FOR EXC MODELS)
KK
F
GG
FF
A
F
ARROW INDICATES
FRONT OF MOUNT