Mounting of the pillar:
Screw the base plate of the metal pillar by using 4 pcs. of M8 x 25 mm
Allen screws, to the claw screw-nuts, which are preinstalled in the
wooden board (the claw screw-nuts are not visible from above).
In this use under each screw head one piece of plastic washer. Tighten
the screws firmly. After assembly the pillar is slightly inclined to the
back. Check and tighten all screws occasionally.
Assembly of the handgrip on the pillar:
Insert the handle from the top into the pillar.
The handle is screwed on from the front with 3 pcs flat round-head
screws M6 x 16 mm.
If no exercise chart is mounted, the handle is screwed on from behind
with 2 more screws M6 x 16 mm.
Insert the screws straightly, they must turn easily.
At first fix all screws only loosely then fix them all firmly.
Mounting of exercise chart, clipboard or laptop board:
Fix the aluminum-exercise chart or the laptop board with 2 pcs flat
round-head screws M6 x 15 mm on top of the metal pillar.
Tighten the screws firmly since the upper screws are also used to
attach the handle. Check and tighten all screws occasionally.
We recommend technical visual check of the Pedalo® 5S stations every 4-8 weeks.
Please check regularly all screw connections between:
- Pillar and base plate – handle bar (at the same time the exercise chart) and pillar – standing platform and base plate.
- Screw connections of the rubber buffer – screw connections of the swivel – mounting of the springs.
Please check all weld seam on the metal pillar.
Clean the metal rod and handle bar with a damp cloth, if necessary with liquid cleaner, of salty sweat.
Clean the wooden parts with damp cloth as well. In case of any worn parts replace them immediately with original spare
parts.