background image

MRS pdqSMART INSTALLATION INSTRUCTION

MORTISE LOCK
ALL MRS – EXCLUDING STS

88322 Rev2 – 5/22/20

5. INSTALL BATTERIES AND 
BATTERY COVER

 

Install batteries and battery cover with 
(2) #8-32 x 1" pan head screws.

BATTERY
COVER

4. INSTALL BATTERY PACK

 

Plug in battery wire to control board.

 

Install battery pack over two studs on 
mounting plate.

 

Snap battery pack onto retainers on 
mounting plate.

BATTERY

PLUG

BATTERY

RETAINERS

BATTERY

PACK

Reviews: