PDQ 6300 Installation Instructions Download Page 3

3

6300/6400V/VF EXIT INSTALLATION INSTRUCTION 

SVR DEVICE

Phone: 833-2-PDQTEC | www.pdqlocks.com

8. INSTALL BOTTOM LATCH

*Omit this step for LBR devices.

 

Install mounting bracket to door with two  
1/4-20 x 5/8" flat head screws.

 

Install latch into the mounting bracket, 
ensuring the long pin is in the designated 
area, using the four #8-32 x 1/4” flat head 
screws.

 

Install rod and bottom bolt into latch body 
ensuring screw and washer are facing 
door.

639401 Rev1 – 5/5/21

7. ADJUST TOP ROD

 

Ensure top latch is in the unlatched 
position by lifting up then releasing the 
rod. Rod should remain up.

 

Depress the push bar and adjust the top 
rod connector by threading it in or out of 
the rod until it lines up with the screw 
hole in the device head. 

Do not 

manually lift the carriage.

 Secure rod 

with #8-32 flat head screw.

9. INSTALL BOTTOM STRIKE

*Omit this step for LBR devices.

 

Close door and mark center of bottom 
bolt on floor.

 

Center strike and mark location of screw 
holes.

 

Drill strike hole and anchor holes 
according to template.

 

Install plastic anchors into floor.

 

Install strike using two flat head screws.

SCREW AND 

WASHER

TOWARD DOOR

PIN IN 

SLOT

Summary of Contents for 6300

Page 1: ...f installing trim 3 INSTALL DEVICE Install device and trim with chassis case screws 2 or 4 screws depending on device and trim type Device can be surface mounted to the door optional sex nuts are available device is through bolted if using trim VF devices must be through bolted on wood or composite doors Panic Fire Alarm MLR 36 Device 6 8 2 3 48 Device 12 14 8 9 Maximum cut off length Reinforced S...

Page 2: ...ur 8 32 x 1 4 flat head screws 6 INSTALL TOP STRIKE Install strike using two 10 24 flat head screws Adjust strike to secure door Install third flat head locking screw by drilling and tapping for 10 24 after final adjustment is achieved 4 INSTALL END CAP Slide end cap into rail Ensure rail is level Mark the slots Remove end cap and prepare holes using the chart from Step 3 Reinstall end cap and fas...

Page 3: ...UST TOP ROD Ensure top latch is in the unlatched position by lifting up then releasing the rod Rod should remain up Depress the push bar and adjust the top rod connector by threading it in or out of the rod until it lines up with the screw hole in the device head Do not manually lift the carriage Secure rod with 8 32 flat head screw 9 INSTALL BOTTOM STRIKE Omit this step for LBR devices Close door...

Page 4: ...ew 11 INSTALL HEAD COVER AND LATCH COVERS Install the headcover Secure with four 8 32 x 1 4 flathead screws Install latch covers secure with two 8 32 x 1 4 flathead screws each 12 INSTALL ROD GUIDES Measure distance between latches and chassis head cover Mark the centers Using the rod guide as a template mark the hole locations making sure the rod is centered in the guide and the guide is level Pr...

Page 5: ...ottom latch bolt as a drill guide for new hole If no bottom latch is present drill hole centered 1 4 from end of rod 4 Install rod in top latch Measure door height subtract result from the standard height shown This number is the amount To cut off the top rod Standard Door Actual Door Cut Example 7 Standard Door 6 8 Actual Door 4 Cut Shorter Rod 37 3 8 7 84 Longer Rod 49 3 8 8 96 Shorter Rod with ...

Reviews: