![PCM MINI-Q Building Instructions Download Page 6](http://html1.mh-extra.com/html/pcm/mini-q/mini-q_building-instructions_1516308006.webp)
MINI-Fireworks building instruction May 2015
www.pcm.at
6
Further, you must check, that the
distance
between the
end of the boom
and
both wingtips
is the same.
If all alignments are correct, glue the boom
with epoxy-
glue
to the middle part of the fuselage.
In addition, the
boom
must be
glued to the bottom of the
fuselage
(see picture above).
Before you fix the servoboard inside the fuselage,
strengthen
the board
with a
carbon roving
.
You can glue the roving with super glue or epoxy glue.
We recommend to
install all electronical components
provisionally before
(see chapter 8) you glue the board
and try to mount the canopy. So you will be sure, that
everything fits inside.
In order to
gain full strength
, it is absolutely necessary to
fix the servoboard
in the fuselage!
Strengthen the edges
of the servo board with
super glue
.
Glue the board
with epoxy-glue
to the boom (see picture
above) and to the sides of the fuselage.
If you have a
hard landing
, always
check
if the servoboard
is still fully glued before you make the next start!