background image

Manual 

Instructions 

5.1 

Measurement 

5.1.1 

AC voltage measurement 

Switch  the  main  function  selector  to 

Connect  the  red  test  lead  to  the  +  terminal 
and the black test lead to the COM terminal. 
Touch the test circuit with the tips of the test 
leads and read the result which will appear in 
the LCD. 

 

 

5.1.2 

DC voltage measurement 

Switch  the  main  function  selector  to 

Connect  the  red  test  lead  to  the  +  terminal 
and the black test lead to the COM terminal. 
Touch the test circuit with the tips of the test 
leads and read the result which will appear in 
the LCD. 

 

 

Summary of Contents for PCE-DC 41

Page 1: ...nts UK Ltd Units 12 13 Southpoint Business Park Ensign way Hampshire Southampton United Kingdom SO31 4RF From outside UK 44 Tel 0 2380 98703 0 Fax 0 2380 98703 9 info pce instruments com www pce instr...

Page 2: ...OLD function 7 4 3 2 PEAK function 7 4 3 3 Zero function 7 4 3 4 Backlight function 7 5 Instructions 8 5 1 Measurement 8 5 1 1 AC voltage measurement 8 5 1 2 DC voltage measurement 8 5 1 3 AC current...

Page 3: ...manual The device may only be used in the approved temperature and humidity range Operating conditions 0 40 C 32 104 F 70 RH Storage conditions 10 60 C 14 140 F 80 RH Inspect the device as well as the...

Page 4: ...cient battery voltage is indicated by icon Auto Power Off after 30 minutes of inactivity to save battery consumption function can be disabled by pressing and holding the HOLD key after an Auto Power O...

Page 5: ...peak model Range Resolution Accuracy 600 V 0 1 V 1 7 10 digits Input impedance 1 M Direct current Range Resolution Accuracy 60 A 0 01 A 2 5 digits 600 A 0 1 A Direct current peak model Range Resolutio...

Page 6: ...y level indication low battery Alternating current source indication Direct current source indication Current measurement indication Voltage measurement indication Data Hold indication Peak data indic...

Page 7: ...K icon will appear in the display The highest value will be displayed and frozen in the display This value is updated anytime a higher value is measured To return to normal mode press the PEAK key aga...

Page 8: ...he COM terminal Touch the test circuit with the tips of the test leads and read the result which will appear in the LCD 5 1 2 DC voltage measurement Switch the main function selector to Connect the re...

Page 9: ...occur that the result is hard to read In this case press the HOLD key and read the result at a later stage 5 1 4 DC current measurement For safety reasons it is recommended to disconnect the test lead...

Page 10: ...lack test lead to the COM terminal Touch the points to be tested with the tips of the test leads and read the result which will appear in the LCD 5 1 6 Continuity test with buzzer Switch the main func...

Page 11: ...collection points designed for that purpose In order to comply with the EU directive 2012 19 EU we take our devices back We either re use them or give them to a recycling company which disposes of the...

Page 12: ...contact PCE Instruments 6 1 PCE Instruments UK By post PCE Instruments UK Ltd Units 12 13 Southpoint Business Park Ensign Way Southampton Hampshire United Kingdom SO31 4RF By phone 02380 987 035 6 2...

Reviews: