background image

Summary of Contents for IMI SENSORS ICP 607A01

Page 1: ...ccelerometer Installation and Operating Manual For assistance with the operation of this product contact PCB Piezotronics Inc Toll free 800 959 4464 24 hour SensorLine 716 684 0001 Fax 716 684 3823 E mail imi pcb com Web www imi sensors com ...

Page 2: ...oid the factory warranty Calibration Routine calibration of sensors and associated instrumentation is recommended as this helps build confidence in measurement accuracy and acquired data Equipment calibration cycles are typically established by the users own quality regimen When in doubt about a calibration cycle a good rule of thumb is to recalibrate on an annual basis It is also good practice to...

Page 3: ... warranty against defective material and workmanship for a period of one year from date of original purchase Contact PCB for a complete statement of our warranty Expendable items such as batteries and mounting hardware are not covered by warranty Mechanical damage to equipment due to improper use is not covered by warranty Electronic circuitry failure caused by the introduction of unregulated or i...

Page 4: ... MACHINE CONDITION MONITORING Piezoelectric ICP Accelerometers Operating Guide Operating Guide with Enclosed Warranty Information 3425 Walden Avenue Depew New York 14043 2495 Phone 716 684 0003 Fax 716 684 3823 Toll Free Line 1 800 959 4IMI MANUAL NUMBER 18405 MANUAL REVISION NR ...

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ...up Inc EX Hazardous Area Approval contact factory for specific approvals Hazardous Area Approval Ex ia IIC T4 AExia IIC T4 Ex ia IIC T4 AExia IIC T4 Hazardous Area Approval EEx nL IIC T4 40 C Ta 121 C II 1 G EEx nL IIC T4 40 C Ta 121 C II 1 G Hazardous Area Approval Cl I Div I Groups A B C D Cl II Div I Groups E F G Cl III Div I Cl I Div I Groups A B C D Cl II Div I Groups E F G Cl III Div I Hazar...

Page 17: ......

Page 18: ...LL MOUNTING SURFACES SEE ARROWS FIG 1 2 FIG 2 TIGHTEN THE MOUNTING STUD USING THE ALLEN KEY TORQUE THE MOUNTING STUD TO WITHIN 3 TO 4 FT LBS 4 1 TO 5 4 Nm FIG 3 THREAD THE SENSOR S HEX NUT ONTO THE MOUNTING STUD POSITION THE CABLE OR CONNECTOR TO THE DESIRED LOCATION AND HAND TIGHTEN THE HEX NUT FIG 4 TIGHTEN THE HEX NUT USING A TORQUE WRENCH TO WITHIN 2 TO 3 FT LBS 2 7 TO 4 1 Nm WHILE HOLDING THE...

Reviews: