2 Product description and functions
10
9932053WI21NA – V02
2012/02
12.
Turn the cover plate (4) such that the designation PAW is on the bottom and the scale is positioned according to
the figure above.
13.
Screw down the cover plate (4) using the screws (3).
14.
Put the knob (2) on the plug axis.
15.
Screw down the knob (2) with the cock plug (8) using the screw (1).
Modifying and c
Modifying and c
Modifying and c
Modifying and commissioning the zone module
ommissioning the zone module
ommissioning the zone module
ommissioning the zone module [Specialist]
[Specialist]
[Specialist]
[Specialist]
1.
Swap the return pipe (D) and the supply length with the pump (B).
Observe the flow dir
Observe the flow dir
Observe the flow dir
Observe the flow direction of the pump!
ection of the pump!
ection of the pump!
ection of the pump!
Turn the pump head such that the terminal box points upwards or to the center of the fitting assembly.
2.
Dismount and replace the ball valves.
3.
Mount and connect the zone module.
4.
Check all the union nuts and tighten them if necessary before commissioning.
5.
Carry out a pressure test and mount the insulation.
Engage the temperature gauge handles (A-2, F-2).
Mixing valve with supply on the right
Mixing valve with supply on the left
supply
supply