5 Scope of delivery [specialist]
2017/01
993x4203-mub-ml – V01
B-7
When the hydraulic separator is mounted vertically, the flow line to the heating circuit must be
connected to the upper connection and the flow line from the boiler must be connected to the
lower connection (see below). Only in this way, an optimum function can be guaranteed.
5
Scope of delivery [specialist]
NOTICE
Complaints and requests/orders of spare parts will only be processed with information on the
serial number!
The serial number is placed on the hydraulic separator.
Return
Return
Flow
Flow
Heating circuit connection