Introduction
137
IPLink 2800 Series Getting Started Guide
F • Installation checklist
Introduction
This appendix lists the tasks for installing an IPLink 2800 Series Managed VPN Router (see
). Make a
copy of this checklist and mark the entries as you complete each task. For each IPLink 2800 Series Router,
include a copy of the completed checklist in your site log.
Table 19. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
IPLink release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Summary of Contents for IPLink 2821
Page 4: ...Summary Table of Contents IPLink 2800 Series Getting Started Guide 4...
Page 18: ...About this guide IPLink 2800 Series Getting Started Guide 18...
Page 114: ...114 Chapter 9 LEDs status and monitoring Chapter contents Status LEDs 121...
Page 134: ...134 Appendix E IPLink 2800 Series factory configuration Chapter contents Introduction 142...
Page 136: ...136 Appendix F Installation checklist Chapter contents Introduction 144...