![background image](http://html2.mh-extra.com/html/patton-electronics/1200p/1200p_installation-and-operation-manual_4082653008.webp)
I
NSTALLATION
A
ND
O
PERATIONS
M
ANUAL
Patton Electronics Co.
1200P
112001UA
2-2
Setup & Installation
CTS Delay (SW2-1,2)
SW2 position 1 selects RTS to CTS delay for the terminal connected to J3. Set
SW2 position 1 to
ON
ON
ON
ON
ON
for no delay and
OFF
OFF
OFF
OFF
OFF
for 25ms of delay. SW2 position 2
selects RTS to CTS delay for the terminal connected to J2. Set SW2 positon 2 to
ON
ON
ON
ON
ON
for no delay and
OFF
OFF
OFF
OFF
OFF
for 25ms of delay.
DSR Control (SW2-3,4)
SW2 position 3 selects DSR control for the terminal connected to J2. Setting SW2
position 3 to
ON
will select DSR on J2 to switch in responce to DTR from J3
switching. Setting SW2 position 3 to
OFF
will force DSR on J2 to Active. SW2
position 4 selects DSR control for the terminal connected to J3. Settting SW2
position 4 to
ON
will select DSR on J3 to switch in responce to DTR from J2
switching. Setting SW2 position 4
OFF
will force DSR on J3 to Active.
J2
SW1
SW2
J3
J1
J4
4
3
2
1
Baud Rate Select
Signal Ground to Chassis Ground
ON For CLK 1
ON For CLK 2
ON
OFF
1
2
3
4
5
6
J2 CTS Delay
J3 DSR Switched
J2 DCD Switched
J3 DCD Switched
J3 CTS Delay
ON=0ms / OFF=25ms
J2 DSR Switched
ON=Switched / OFF=Constant
ON=Switched / OFF=Constant
Power (PW)
J2 - TX Data (TX)
J2 - RX Data (RX)
J2 - Request to Send (RS)
J2 - Clear to Send (CS)
J2 - Carrier Detect (CD)
DS3
DS4
DS5
DS1
DS2
DS6
Baud Rate Selection - SW1
3
OFF
ON
OFF
ON
OFF
ON
OFF
ON
4
OFF
OFF
ON
ON
OFF
OFF
ON
ON
5
OFF
OFF
OFF
OFF
ON
ON
ON
ON
CLK1
600
1200
2400
4800
9600
19200
38400
76800
CLK2
450
900
1800
3600
7200
14400
28800
57600
Alternate
Power
Entry
ON
OFF
1
2
3
4
5
6