
3
Instructions for PE2, PE5 and PE10
Installation - Indoors/dry locations with AC 120 V line connection
1
Mount the unit on a suitable vertical support or wall material using a 3”
(75 mm) flat headed nail. Hammer in the nail, allowing it to protrude by
3/8” (10 mm). Slide the unit onto the nail with the nail inside the mounting
hole on the back of the unit.
2
Connect the Fence ground terminal (green) to a separate ground system that
is at least 33’ (10 m) away from other ground systems.
3
Connect the Fence output terminal (red) to the fence.
Note:
If the unit is being mounted on a wall made of concrete, brick, plasterboard
or similar, use a screw instead of a nail. A wall anchor or plug may also be
required.
Operation
1
Plug the unit into the AC 120 V power supply.
2
Turn on the AC 120 V power supply switch.
The pulse indicator light flashes each time the unit pulses.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct
file and location.