background image

10

8.  Install Anenna Panels noting overlay of joining edge.  Join 2 panels to one Radial Beam
using 1/4” Allen Bolts from the Reflector and Feed pack.  Work out from the hub (note edge
overlay should be even) Tighten the hardware into each J-clip after all hardware is in place.

9.  Install 48- 1/4” Allen bolts with flange nuts to Antenna Panel perimeter edge and Outboard
Skirts tightening them as they are installed.

10. Tighten all Reflector hardware at this time.

Summary of Contents for Commercial Antenna Polar Mount

Page 1: ...3 1m Commercial Antenna Polar Mount...

Page 2: ...ance with any part of this claim procedure may invalidate this warranty in whole or in part THIS WARRANTY IS EXPRESSLY IN LIEU OF ALL OTHER AGREEMENTS AND WARRANTIES ANY IMPLIED WARRANTY OF MERCHANTAB...

Page 3: ...Be prepared to safely handle these forces at unexpected moments Do not at tempt to assemble move or mount dish on windy days or serious even fatal accidents may occur PA TRIOT ANTENNA SYSTEMS is not...

Page 4: ...obstructions etc When selecting look angle be sure to observe and take readings approximately 10 deg to the left and right above and below your selected look angle Before Ground Pole Installation the...

Page 5: ...WELDED 000 8 3 231003 OUTBOARD SKIRT 3 1 PRIME 000 8 4 231004 ASSY 3 1 HUB 000 1 5 231106 PLATE C BAND 3 1 3 8 4 5 000 1 6 PRT POLAR MOUNT POLAR 3 1mtr 000 1 7 231081 BRKT TRACKER EXTENTION 000 2 8 2...

Page 6: ...Pipe On one skid 215 Lbs Note See Foundation Requirements Specifications above In Ground Mast Foundation Foundation Requirements Specifications Steel Mast Schedule 80 L 120 4 O D Concrete 3000 psi at...

Page 7: ...ion in these areas 1 Attach Tracker Extention Brackets to Polat Mount as pictured below Mkae sure to stack BOTH brackets to ensure proper allignment of azimuth lock down 2 Loosen all Rough Adjustment...

Page 8: ...Hub Mount assembly and slide it down onto the 4 mast pipe 3 Attach 231082 ASSY POLAR TRACKER ATTMT to the proper side of the hub where the majority of the satellites to be viewed are located 4 Adjust...

Page 9: ...al Beam pack as shown J clips 7 Now install the Outboard Skirts on the end of the Radial Beams as shown using 2 1 4 Allen bolts from hardware labeled Reflector and Feed pack note the overlay of the ad...

Page 10: ...ector and Feed pack Work out from the hub note edge overlay should be even Tighten the hardware into each J clip after all hardware is in place 9 Install 48 1 4 Allen bolts with flange nuts to Antenna...

Page 11: ...r and Feed Support Assembly 11 Feed Struts are to be installed as shown by using the fourth bolt from the edge of the reflector Install the 4 struts 90 degrees apart using every other panel Feed Strut...

Page 12: ...ver C Band Feed Plate Optional 3 1m Wind Kit Install the Wind Kit Struts to the back of the Reflector using the supplied 1 4 hard ware as shown below 2 Install the Wind Kit Struts to the back of the R...

Page 13: ...en adjust the elevation angle until its maxed At this point you have set the off set angle and the elevation angle for the satellite at the highest point in the arc 6 Now you have to get the dish to t...

Page 14: ...ting to the latitude angle of your site Peak this elevation adjustment on on a due south satellite with satellite measuring or veiwing equipment Next drive the actuator to a lower look angle and peak...

Page 15: ...Covers for Commercial Antennas as well as Home System Keep snow from interfering with your signal Prevent Snow Ice from accumlulating on your system with a De Icing System Complete line of Antenna Con...

Page 16: ...6 61 3dB Beamwidth 1 72Deg 55Deg Avg 1st Side Lobe 30dB 23dB Cross Polarization 35dB 35dB VSWR max 1 25 1 1 25 1 Mechanical Antenna Size 3 1m 10 Focal Distance 1 04m 41 04 F D 336 Operational Wind 45m...

Reviews: