background image

4.

 

Install panel T1 and B3 using the same procedure as in step 3. 

   

 

 

 

8

Summary of Contents for 1.0m Back Pack Antenna System Assembly

Page 1: ...orth Clark Street Albion MI 49224 USA Phone 1 517 629 5990 Fax 1 517 629 5990 www sepatriot com PatriotAntenna Systems AssemblyManualforthe 1 0mBackPackAntenna System 1 0 meter Back PackAntenna Revision 002 ...

Page 2: ...e antenna system that comes carefully packed in a portable back pack case It is a precision instrument that will provide many years of reliable service if assembled and handled with proper care Become familiar with these instructions before attempting to work with this antenna system Completely unpack all the components and identify each one to know it s function and purpose 2 ...

Page 3: ...design The elevation adjustment is accomplished using a turnbuckle that can be rough adjusted in slotted ribs on the back of the reflector then fine adjusted by turning the body of the threaded turnbuckle Azimuth adjustment is accomplished by using a turn knob that moves the antenna in a controlled means in the azimuth plane until the RF signal is peaked A locking handle mechanism then locks it to...

Page 4: ...4 ...

Page 5: ...ide the Feet assemblies into each of the 3 Leg assemblies as shown The flatted side of the pin faces the locking cam Simply turn the cam downward to lock the pin at the desired height 2 Insert the Leg assemblies onto the bottom side of the AzEl assembly as shown by aligning the dowels and tightening the threaded fasteners 3 Roughly level the Mount Assembly using the level bubble as a reference by ...

Page 6: ...e the mounting lugs into the receiving brackets of the Mount assembly taking care to align the flatted sides of the pins with the flatted sides of the receiver brackets Then with the indicator line of the knob aligned pointing to the Elevation Turnbuckle pivot the panel assembly engaging the turnbuckle into the knob pin When fully engaged turn the knob approximately turn CCW to lock The panel asse...

Page 7: ...3 Install panel T2 by simply guiding it into position as shown onto the alignment dowels The panel will stay in place The seam between the panels should look flush 7 ...

Page 8: ...4 Install panel T1 and B3 using the same procedure as in step 3 8 ...

Page 9: ... Install panel B1 and B3 using the same procedure as in step 3 Panels B1 and B3 will need to be held slightly back and aligned simultaneously with their respective upper panel and it s alignment dowel 9 ...

Page 10: ...After making sure all seams look flush fasten the two latches on the back of the dish then fasten the six remaining perimeter latches 10 ...

Page 11: ...e to facilitate attachment of the Feed Assembly parts Appox 45deg 2 Insert the Feed Tube assembly into the receiver at the bottom of panel B2 It must be held at the approximate angle shown Then once it is fully inserted rotate upwards to be able to attach the side struts 11 ...

Page 12: ...ch each side strut Snap on to side panels first then snap to corresponding ball snap on the Feed Tube assembly Assembly is now complete Antenna system can acquire satellite once RF connections are complete 12 ...

Reviews: