![Patriot Lighting SOLAR SHED LIGHT User Manual Download Page 2](http://html1.mh-extra.com/html/patriot-lighting/solar-shed-light/solar-shed-light_user-manual_4005680002.webp)
INSTALLING THE LED LIGHT
OPTION 1: INSTALLING THE LED LIGHT WITH INTEGRATED MAGNETS
The LED shed light (A) has integrated magnets for easy and practical installation without the use of screw holes.
OPTION 2: INSTALLING THE LED LIGHT WITH MOUNTING HARDWARE
INSTALLING THE SOLAR PANEL
First Use: It is recommended that the battery pack be charged by the solar panel in direct sunlight for 14 hours
before the first use
.
The LED light (A) can be turned on/off by the switch (A3) located on the side. The solar shed light is now ready to be used and will run approximately
3 hours on full charge.
166mm
~ 6.5 in
166mm
~ 6.5 in
Back View
Back View
Metallic Surface
Wall
Front View
Side View
INSTALLATION (CONTINUED)
OPERATION
A
A
A
B
1
B
A
B
1
B2
A1
C
A
A3
Side View
A4
A4
Step 1
The LED shed light (A) has two pre-drilled key-hole mounting slots (A4) for permanent
installation. The two pre-drilled key-hole mounting slots are approximately 6.5 inches
apart.
Step 1
Place the solar panel mounting bracket (B1)
on the chosen surface. Using a pencil, mark
the three screw holes through the bracket.
Step 2
Use a power drill to drill the holes on
the chosen mounting surface.
Step 3
Screw the solar panel (B) to the
chosen surface with the included
screws (C).
Step 4
You can now connect the wire (B2) from the solar panel to
the LED shed light socket (A1).
Step 2
Use a power drill to drill
the holes on the chosen
mounting surface.
Step 3
Install the included screws
(C) into the chosen surface.
Step 4
Place the LED shed light (A)
over the screws, aligning the
key-hole mounting slots with
the screws. Pull downwards to
secure the light in place.
Wall
C
A
A
Page
2