Patriot Docks Manual Pontoon Assembly Instructions Download Page 2

Patriot Docks

 

Assembling the frame:

 

Two Lift Tubes are joined together using the Mending Insert, secure 

using 3/8”x 2” bolt. Repeat this step for the other Lift Tubes as well 

as for the two pair of Stringer Tubes. This will create the 9’ frame 

pieces.

 

 

The Stringer Tubes are then secured to the Lift Tubes using the pre

-

drilled mounting holes and 3/8”x 2.5” bolts.

 

Aluminum Jack:

 

Each aluminum jack is mounted using 

a Backer Plate and four 3/8”x2

-

1/2” 

bolts. All the jack supports should be 

orientated toward the entrance of 

the lift (as pictured).

 

Typically, the jack is mounted using 

the very bottom set of mounting 

holes in the flange. For deeper water 

applications the unit can be mounted 

higher, creating a higher starting 

point.

 

The drop leg base is comprised of 

two pieces, bolt the vertical tube to 

the flat base then insert the vertical 

into the jack and set desired height.

 

The jack fender is installed last using 

two 3/8”x 3

-

1/2” bolts.

 

Glides are installed after 

frame has been assembled. 

Mark the location where 

the Glide will be installed 

and pre

-

drill 1/8” pilot 

holes. Use included 

mounting screws to secure 

the Glides.

 

54” Tubes

 

24” Insert

 

www.patriotdocks.com

 

Reviews: