
12
LA6 Signal Tower Complete Operation Manual
Assemble the body ( N type)
or alarm unit (B type)
Fix the Terminal Block
bracket in place with a nut.
5
6
4
5
7
Attach the wires
6
Use waterproof sealant if needed.
8
Point 1
Point 2
With the body ( type), or
alarm unit ( type), turn it to
the right to remove.
B
N
(
Refer to
)
(
Refer to “5. Wiring”
)
Point 1
Use sealant to prevent water intrusion.
(from the mounting under-side)
If the installed environment exposes water, etc.,
to the under-side of the mounting surface, be
sure to use sealant on the mounting and
distribution holes.
When not using an attachment
angle, make a fitting hole of
∅
22-23mm.
Model Steel pole with Mounting angle and Cable
LJ
Mounting
Surface
35mm
12.2 N.m(Standard)
Recommended Torque
30 N.m(Standard)
Recommended Torque
Threaded hole for cable gland attachment
(
Effective Screw Length for M16x1.5 is 12 mm in length
)
B
N
〈
Notes
〉
Do not pull the lead wire
connected to the Terminal
Block bracket and body
(or alarm unit).
Model Direct Mount/Screwless Terminal Block
TN
4
(Use the “Installation Template” on
Pg. 29 of the Instruction Manual
)
Feed the wiring through the hole and
set the pole in place to install.
Drill Hole (∅11mm in two places)
(Use the Installation Template on
Pg.29 of the Instruction Manual)
Use commercially available M10
nuts and bolts to fasten with.
0.75 N.m(Standard)
Recommended Torque
Thread the wires through the wiring hole.
Insert a mounting bolt into the installation hole.
4
Attach the mounting nut from the back-side.
5
Use waterproof sealant if needed.
6
(
Refer to
)
Point 1
(Use Installation Template on Pg.29 of
the Instruction Manual
)
0.75 N.m(Standard)
Recommended Torque
Model Direct mount and Cable
WJ