![Parmco DDC800BI Installation And Operating Instructions Manual Download Page 12](http://html1.mh-extra.com/html/parmco/ddc800bi/ddc800bi_installation-and-operating-instructions-manual_3773653012.webp)
8
Preparing the unit for a built-in appliance
1. Make a square opening on the table surface with the size of 765*490mm,then make a square hole from the
beside of the cupboard, with diameter of about 240*100mm, refer to Pic above for the specification.
2. After drilling a hole on the table surface, carefully remove shavings or sawdust before inserting the appliance,
as they could be sucked up by the appliance and compromising its function.
3. Make sure the table surface is level and square and that no part interferes with the space required for
installation. The kitchen units that are in direct contact with the appliance must be heat-proof(min. 80
℃
).
Installing the appliance (Ducting pipes are not included in the package)
1. Dismantle the package and take out the instruction manual.
2. Put a towel or cloth on the table surface. Place the glass face down on the protected surface. See pic 1.
3. Apply the sealing strip to the edge of the bottom of the hob, leaving about 3mm from the edge of the glass.
Apply the seal all around the circumference. Cut off the excess part and link the two ends of the sealing strip.
See pic 2.
4. Clean the surface of the motor air outlet with a cloth, stick the sealing strip around the air outlet, cut off the
excess part and link the two ends of the sealing strip. See pic 3.
5. Open a 240*100mm square hole on the side of the cupboard in the direction of the air outlet. See pic 4.