Do not operate the product if the power
cord or power plug are damaged, nor if the
product does not work or is damaged in any
way .
¾
If the power cord is damaged, it must be
replaced by the manufacturer, its service
agent or similarly qualified persons in order
to avoid a hazard .
¾
Do not disconnect the power plug from the
socket outlet by pulling on the power cord .
Special safety information for rope
hoists
¾
Persons who intend to use the product
must first receive appropriate training or
instructions .
¾
It is prohibited to move persons with the
product .
¾
It is prohibited to lift loads in excess of the
nominal load .
¾
Do not attempt to lift stuck or jammed loads .
¾
The steel cable must be taut when lifting the
load .
¾
Do not pull the loads in horizontal direction .
¾
Avoid switching the product on and off
rapidly (inching operation) .
¾
Always be attentive when operating the
product .
¾
Do not leave hanging loads unattended
without taking appropriate safety measures .
¾
Do not stand or work underneath raised
loads .
¾
The product has not been outfitted with a
rated power limit . Do not attempt to lift the
load further when the overheat protection
limits operation . In this case, the load has
exceeded the product’s nominal power .
¾
Do not use the maximum/minimum length
levers 15 16 routinely as a stop mechanism .
These levers serve as a stop mechanism only
in emergencies .
¾
Before you begin: Check whether
–
the steel cable 14 is wound properly
around the drum 17 and whether
–
the space between coils is less than the
diameter of the cable itself (Fig . D) .
Assembly
(Fig . E)
m
DANGER!
u
The square tube must be able to bear
a minimum load of 500 kg at the
points where the product is fastened . If
you are unsure, consult a professional
(e .g . a structural engineer) .
u
Seek advice from a qualified technician to
ensure all screws are tightened fully and
correctly .
u
A qualified technician or a properly
trained person should check the anchoring
of the square tube before the product is
started .
¾
Fasten the product with the mounting
brackets 1 and the mounting screws 2 to
a suitable square tube .
¾
Tighten the mounting screws 2 .
Before first use
¾
Remove the transport lock from the steel
cable 14 . Cut the rubber band and remove
it .
Summary of Contents for PSZ 250 A1
Page 3: ...A C B 16 15 1 3 6 4 5 7 8 11 14 10 2 9 13 12 15 16 17 18 11 10 12 ...
Page 4: ...D E F G H I J K ...
Page 14: ...14 GB EC Declaration of conformity ...
Page 24: ...24 HU EK megfelelőségi nyilatkozat ...
Page 34: ...34 SI Izjava ES o skladnosti ...
Page 44: ...44 CZ ES prohlášení o shodě ...
Page 54: ...54 SK ES vyhlásenie o zhode ...